Rajgir mein solar panel lagwane ka sahi process kya hai? Is guide mein jaaniye installation, subsidy, aur approval ka step-by-step procedure.
Rajgir, a town known for its rich history and tourism, is facing increasing electricity costs and frequent power cuts. In such a scenario, solar energy has emerged as a viable solution. However, many residents wonder: "What is the correct process for installing solar panels? Where should I start? Will I receive any subsidies?"
In this blog, we will outline the current process for 2025 in a clear and practical manner, ensuring you can follow it without any confusion.
First, you need to assess your household's average daily electricity usage. What does a typical household in Rajgir look like?
If your monthly electricity bill is between ₹2000–₹3000, you are consuming approximately 10–12 units/day. For this, you will need a 3kW solar system.
A solar system will only work effectively if your roof:
If you have a sloped roof, solar panels can still be installed using elevated structures.
There are several local vendors in Rajgir, but for subsidies, you need a MNRE registered installer or a DISCOM approved vendor.
A good installer will provide you with:
Ghar Ghar Solar, for example, offers complete services in Rajgir with EMI options as well.
In 2025, you can receive up to ₹78,000 in subsidies through the PM Surya Ghar Muft Bijli Yojana.
Steps to apply:
The total cost and subsidy breakdown for a 3kW system may look like this:
ItemCost (INR)3kW System MRP₹2,10,000Government Subsidy₹78,000Ghar Ghar Solar Discount₹18,000Final Price₹1,14,000
This price includes:
If you do not want to pay ₹1.14 lakh upfront, 0% EMI plans are also available.
DurationEMI per month12 months₹9500/month18 months₹6500/month24 months₹4800/month
Required Documents:
After the survey and approval, the installation process:
Total Time: 10–15 working days
To install a rooftop solar system in Rajgir:
The survey is free. EMI and subsidy details will be provided on the same day.